Tunnel Jumeirah Palm Island, United Arab Emirates
Projekt adatok
Helyszín: Dubai, Egyesült Arab Emirátus
- length of tunnel: 996 m
- total length: 1.4 km
- width/ height of cross-section: 38 m / 9.16 m
- structure: tunnel in open-type construction with separate casting method, three-cell rectangular cross-section
Projekt követelmények
- 25 m long concreting sections
- fabrication of bottom plate, two shear walls and slab after each other
Ügyfél
Al Naboodah Engineering Services L.L.C., Dubai
Ügyfél előnyök
- fast cycle sequences
- easy handling
- versatile utilisation
- application of 200,000 m³ of concrete in a construction time of only 11 months
Walter Freitag
Construction Manager
We were able to achieve a fast cycle sequence with the PERI systems. They are easy to handle and offer many different uses. On top of this, PERI offered us the required technical support at the jobsite.
PERI megoldások
- tunnel formwork solution from system components
Alkalmazott PERI rendszerek