Tunnel bypass Flüelen, Switzerland

Tunnel bypass Flüelen, Switzerland - The special support und moving construction comprised of elements from the PERI tunnel waler system which adapted exactly to each cross-section. The complete formwork unit could be moved on rails from section to section using pulling equipment supplied by the contractors. Due to economic reasons, setting and stripping were done mechanically.

Projekt adatok

Helyszín: Flüelen, Svájc

Oval-shaped tunnel cross-section with a height of 12.80 m

  • total length: 2.6 km
  • construction period: 1999 - 2005

Projekt követelmények

  • section-wise concreting of the complete cross-section in one pour
  • short construction time

Ügyfél

Arge Tunnel Umfahrung Flüelen (ARGE TUF) Murer AG, Erstfeld -
Prader AG Tunnelbau, Zürich; Zschokke Locher AG, Zürich; Rothpletz Lienhard + Cie AG, Aarau; CSC Impresa Costruzioni SA, Lugano

Ügyfél előnyök

  • four tunnel sections finished in only 9 days
Tunnel bypass Flüelen: Felix Bissig und Hansruedi Walker, Foremen
Felix Bissig | Hansruedi Walker
Foremen

From PERI, we got the most efficient solution. Despite the large dimensions, we were able to concrete in one pour!

PERI megoldások

  • tunnel formwork carriage for four sections with section lengths of 5.50 m
  • since there were only four cycles, decision to go without integrated hydraulics