Midfield Terminal Building, United Arab Emirates

Midfield Terminal Building, Abu Dhabi - The Midfield Terminal Complex is the ultimate in construction sites.
Midfield Terminal Building, Abu Dhabi - Over 6,000 PD 8 slab tables are in continuous use which is the equivalent to an area of almost 10 football pitches.
Midfield Terminal Building, Abu Dhabi - The massive beams are being constructed in one pour together with the slabs.
Midfield Terminal Building, Abu Dhabij - Moveable PD 8 slab tables form the load-bearing sub-structure along the beams; for the slabs, MULTIFLEX girder slab formwork is used.
Midfield Terminal Building, Abu Dhabi - Easy lateral transport: the PD 8 slab tables can be moved by hand by means of a transportation trolley. This reduces crane requirements quite considerably.
Midfield Terminal Building, Abu Dhabi - PD 8 is the proven shoring system for slab tables and accommodates high loads. With only two different frame heights, almost any required height can be realized.
Midfield Terminal Building, Abu Dhabi - In order to process over 1,000 m³ every day, huge numbers of personnel and material are required.
Midfield Terminal Building, Abu Dhabi - For forming the up to 12.50 m high reinforced concrete walls, VARIO GT 24 girder wall formwork provides a maximum level of adaptability through the variable arrangement of lattice girders, steel walers and tie positions.
Midfield Terminal Building, Abu Dhabi - PERI is supporting the fast construction progress with over 6,000 slab tables as well as comprehensive formwork solutions, also for the walls and columns. As of 2017, up to 30 million passengers will be handled annually.

Projekt adatok

Helyszín: Abu Dhabi, Egyesült Arab Emirátus

  • X-shaped airport terminal building (Midfield Terminal Building MTB), situated between two runways, with capacity for 65 large aircraft
  • 50 m high seven-storey central structure (Central Processor) with a total area of 700,000 m²
  • 12,000 laborers at site working in shifts
  • Scheduled opening in 2017 for up to 30 million passengers annually

Projekt követelmények

  • Quick processing 700,000 m³ concrete and 200,000 t steel
  • Completion of all structural works in 18 months only
  • In-sequence delivery of huge material quantities
  • Realisation of varying slab geometries and heights
  • Possibility to handle formwork and scaffolding manually due to limited crane disposability

Ügyfél

TAV, Consolidated Contractors Company (CCC) and Arabtec Construction Joint Venture

Ügyfél előnyök

  • Prompt availability of material
  • Quick moving of the slab formwork
  • Reduction in crane usage
  • Simple adjustments to the shoring tower heights
  • Problem-free working also for inexperienced personnel due to simple handling and robust materials

PERI megoldások

  • Delivery of large quantities of materials at very short notice
  • 65,000 m² on-site formwork requirements (6,200 PD 8 slab tables)
  • Use of robust and straightforward systems
  • Beam solution with PD 8 slab tables and LIWA side formwork
  • Slab tables moved by means of transportation trolleys
  • Project formwork for 4,000 columns with edge lengths/diameters 1.00 – 2.50 m on the basis of VARIO and SRS
  • Flexibly adaptable formwork and scaffolding solutions to accommodate the range of dimensions
  • Flexible engineering for adapting to planning and construction progress changes