Deer crossing bridge Zehun, Czech Republic

Deer crossing bridge Zehun, Czech Republic - PERI UP Rosett formed the falsework construction and was erected according to the type test. The tight construction schedule required support along the entire length of 75 m.
Deer crossing bridge Zehun, Czech Republic - The 10 m long concreting sections were realized using the back-step method produced (alternating sequential method).
Deer crossing bridge Zehun, Czech Republic - For the tight radii in the side areas, the GRV articulated waler system was used. MULTIPROP towers ensured a safe transfer of loads into the ground.
Deer crossing bridge Zehun, Czech Republic - PERI developed an easy-to-assemble and load-bearing falsework construction using the PERI UP Rosett modular scaffolding system.

Projekt adatok

Helyszín: Zehun, Csehország

  • green bridge over the D11 motorway as 10 m high arch, 36 m wide and 75 m long

Projekt követelmények

  • tight construction time schedule
  • pouring with the alternating sequential method in concreting sections of 10 m

Ügyfél

PSVS, Prague

Ügyfél előnyök

  • adherence to required construction time through material provision for the complete length
  • time advantages due to detailed implementation planning and simple erection
Milan Jerábek, Construction Manager
Milan Jerábek
Construction Manager

The extremely tight construction time made it necessary to provide the whole formwork in total. PERI offered us a comprehensive solution with the GRV articulated waler formwork, PERI UP Rosett and MULTIPROP. We were able to erect the falsework in a very short time thanks to the PERI supervisor. It was absolutely right to decide in favour of PERI.

PERI megoldások

  • falsework and formwork adjusted to one another
  • short-term delivery and provision of complete formwork material
  • detailed implementation planning
  • PERI supervisor
  • falsework with PERI UP Rosett