Las Torres de Hércules, Spain

Las Torres de Hércules, Los Barrios, Spain - Over the entire height, oversized letters into the concrete facade symbolize the inscription "Non plus ultra".
Las Torres de Hércules, Los Barrios, Spain - For constructing the 40 cm thick concrete wall with an outer radius of 25 m, the VARIO GT 24 girder wall formwork was climbed on 12 ACS self-climbing platforms respectively.
Las Torres de Hércules, Los Barrios, Spain - The ACS G self-climbing variant carried both the internal and external formwork as well as the concrete placing boom mast to the next cycle each time.
Las Torres de Hércules, Los Barrios, Spain - With help of the ACS self-climbing technology, the two circular towers rose steadily upwards in regular 10-day cycles.
Las Torres de Hércules, Los Barrios, Spain - The climbing process was unaffected by the weather and took place without a crane using the proven ACS 100 climbing units.
Las Torres de Hércules, Los Barrios, Spain - The floor slabs were cost-effectively and safely realized with the GRIDFLEX aluminium grid slab formwork.

Projekt adatok

Helyszín: Los Barrios, Spanyolország

Group of office buildings near Gibraltar, with two towers. Oversize letters integrated into the concrete facade symbolise the wording “Non plus ultra“.

Height: 100 m
Storeys: 21
Construction period: 2006 - 2009

Architect: Rafael de La-Hoz

Projekt követelmények

  • fair-faced concrete
  • limited crane capacity
  • outer and inner formwork on the same climbing platform, which was erected outside

Ügyfél

Construcciones Sanchez Dominguez S.A., Malaga

Ügyfél előnyök

  • regular 10-days cycle
Las Torres de Hércules Statement: Juan Jose Gutiérrez Moya, Construction manager
Juan Jose Gutiérrez Moya
Construction manager

This project would not have been possible without the PERI ACS self-climbing technology. It is a great and absolutely safe system. Also the cooperation with PERI is again and again ideal.

PERI megoldások

  • ACS climbing units for an outer radius of 25 m