Langen Foundation, Germany
Projekt adatok
Helyszín: Neuss-Hombroich, Németország
Construction period until opening: until 2004
Architect: Tadao Ando Architect & Associates, Osaka, Japan
Projekt követelmények
- predetermined plywood pattern
- predefined quantity, position and distance of tie points
- all corners with sharp edges
- joint formation on equal areas, close formlining joints
- use of SVB concrete with 100 kN/m² concrete pressure
Ügyfél
Florack GmbH, Bonn
Ügyfél előnyök
- outstanding concrete result
- no visible joint off-set
Thomas Schieren
Foreman structural engineering
As we of course expected, we were able to achieve an excellent concrete result with the PERI formwork solution. We have been working with PERI for 20 years now and it has always served us well.
PERI megoldások
- VARIO GT 24 girder wall formwork with a special panel format screwed at the back
- VARIO GT 24 girder wall formwork elements with 190 cm x 90 cm formwork panel and optically required six tie points per panel, partly as blind plug
- utilisation of the fair-faced concrete coupling to reduce the joint off-set
Alkalmazott PERI rendszerek