Eemshaven Power Plant, Netherlands

Eemshaven Power Plant, Netherlands - For the power plant construction in Eemshaven, the industrial scaffold system PERI UP has clearly demonstrated its flexibility and adaptability.
Eemshaven Power Plant, Netherlands - Working platforms and integrated access means for the welding and insulation operations on the two electric filters for the flue gas desulphurisation are based on the PERI UP Rosett Flex modular scaffolding system.
Eemshaven Power Plant, Netherlands - For the spatial scaffolding of the filter funnel, the metric grid system of the PERI UP scaffolding system which allows the bay widths to be divided as required is a particular advantage.
Eemshaven Power Plant, Netherlands - Also for the assembly and insulation of the 8 funnel-shaped inlet ducts, the PERI scaffold construction provides ideal working conditions.
Eemshaven Power Plant, Netherlands - The 75 cm working width can be adapted on the inside in 25 cm increments whilst, on the outside, integrated flights of stairs provide optimum accessibility to all scaffolding levels.
Eemshaven Power Plant, Netherlands - The scaffolding planning and assembly took into account the existing steel structure – allowing maximum adjustment to suit the structural circumstances.
Eemshaven Power Plant, Netherlands - The Eemshaven power plant (left in photo) plays an important role in the modernisation and guaranteeing the electricity supply in the Netherlands – in combination with the utilisation of wind and solar energy.

Projekt adatok

Helyszín: Eemshaven, Hollandia

Highly efficient coal-fired power station complete with a switchable biomass combustion facility with 1,600 MW capacity

  • 64 m long and 35 m high electric filters for flue gas desulphurisation
  • 4-year construction period, operational in 2014

Projekt követelmények

  • Working scaffold for welding and insulation work
  • Realisation of working platforms in accordance with the highest quality standards

Ügyfél

Bilfinger Industrial Services Polska Sp. z o. o., Warsaw

Ügyfél előnyök

  • High level of working safety for scaffold assembly and use
  • Good accessibility with a minimum of material utilisation
Eemshaven Powerplant, Daniel Kuceł, Site Manager
Daniel Kuceł
Site Manager

The collaboration with PERI is highly satisfactory for both Bilfinger as well as our client, and we have been able to meet all of the deadlines. For me, PERI UP stands for quality and ergonomics, not least due to the fact that the PERI UP scaffold construction could be optimally adapted  to ensure safe execution of the sound-proofing work.

PERI megoldások

  • Working platforms and access means on the basis of adaptable PERI UP Flex modular scaffolding
  • Dividable scaffold bays as required for generous dimensioning with 3 m bays as the basis and optimal geometrical adjustments in 25 cm increments in the area of the components involved
  • Facade-side working scaffold using modular scaffolding with a guardrail in advance assembly